Call 844.600.0075 or complete the form below and an expert from CloudSAFE will be in touch with you. Please do not use this form for support/help desk requests.
With up to 3.5 million square feet of Tier 5 Platinum data center space at The Core Campus in Las Vegas, Switch enables us to bring world-class colocation and connectivity services to our Customers.
Key Statistics
Power
Up to 430MW of power
100% green power
100% power uptime guarantee
Up to 55kW per cabinet
Connectivity
5ms to Los Angeles
50+ carriers
35-60% savings
MPLS, IP, Transport, SIP and SD-WAN
Tax Incentives
2% sales and use tax in Nevada
75% reduction in personal property tax in Nevada
No personal state income tax in Nevada
Standards
Recognized as Tier 5 Platinum, surpassing the Uptime Institute’s Tier IV Gold standards
Meets and exceeds the standards of IEEE, ANSI, ASHRAE, 24/7, ISO 9001, SAS 70/SSAE-16, BICSI, the Green Grid Association and more